![]() |
| Bottom landing |
![]() |
| Top landing |
![]() |
| Space cut out at the top for an additional step |
![]() |
| Lanai in front of the main house with finished cumaru boards ready to be installed. |
![]() |
| In front of the master bedroom. All of the joists have been painted, tape put on the tops, and the tape is painted. |
![]() |
| The first board installed |






No comments:
Post a Comment