Saturday, December 22, 2012

Sun Downpours

We often get brief but torrential downpours, and if it's early or late in the day when the sun is low, it'll be sunny while it's pouring.  These are not light sun showers, but heavy downpours.



Monday, December 17, 2012

Lanai Ceiling Installation

The finished lanai ceiling board were installed.
The open space and rafters above the lanai.

Mitch installing the ceiling boards
Almost done, but we were a few board short.
View from the other side
View from the front (with interior doors to be installed)


Saturday, December 15, 2012

Electricity!

Today the electrician came and did most of the electric finish.  This means that we have (working) electrical outlets, lights, and switches, and no more extensions cords.  We weren't expecting to get everything hooked up until after the final inspection, so it was a pleasant surprise. 

We were able to go from this:
(several power strips going through holes in the floor, connected to extension cords outside, plugged into temporary outlets hooked into the temporary circuit breaker box),
To this:
We also got light fixtures:
Kitchen light
Hall bathroom
 Ceiling fans
Kitchen (dining area)
Master bedroom
Working light switches
And even outdoor lights.
There are still a few things that need to be done, but the bulk of it is hooked up and working.

Our electrician's truck. Don't let the local yokel graphic fool you. Moke lives in a 6,000 square foot house.

Friday, December 14, 2012

Kitchen cabinets

The wall kitchen cabinets were installed.  The kitchen is almost done -- we're still waiting for the cooktop to be delivered.



Thursday, December 13, 2012

Staining the Lanai Ceiling Boards

There's been a lull in the work on the house, but  I've been staining and sealing the boards that will be installed above the lanai.
The open area above the lanai (the silver is a thermal barrier that reflects heat from the sun to keep the house from warming up).
Stained (16-foot and 10-foot boards).  Sealer is applied to both sides.

Wednesday, December 12, 2012

Railings, stairs, doors, and bath vanity counter

The last of the lanai railing balusters were installed.

The stringers for the side stairs were put in.
And we got our first interior door (unfinished for now)
For the master bath, we decided to use a wood counter. Mitch hand-crafted this vanity top from a mango slab and backsplash (put on the vanity before cutting the holes for the sink and faucet to check positioning). It's pretty stunning work.

Wood grain detail




Monday, December 10, 2012

Bench in Hall Bath

The granite bench was installed in the hall bath (the granite matches the vanity counter).  All that's left to finish this bath is a shower door.

Friday, December 7, 2012

Master Bath Tiling Done

The alcove in the master bath was tiled, and shower is done.

The tile in the alcove is the same as the floor tile.


Wednesday, December 5, 2012

Master Bath Floor

For the master bath floor, we chose a green and black pebble tile to match the rainforest tile in the shower.



Tuesday, December 4, 2012

Trenching Done

 After many hours of digging, the trenching is done.

Trenches for the downspout on this side of the house and from the other side (the pipe runs under the house)
This trench is for a diverter pipe that captures the first run-off from the roof (to wash away dust, leaves, etc. so they don't go into the tank)
A few days after moving into the house, we discovered that our giant buff Orpington chicken is actually a rooster.
Inspecting the trenches

What're you looking at?