Big Island Living

Pages

  • Home
  • Eruption Update
  • Additional Pages

Wednesday, August 21, 2013

Framing continues

The framing work is continuing.
This is the back wall with the assembled side wall ready to be raised on the left


Mitch and Hazen putting the finishing touches on the side wall

Posted by david at 9:41 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2015 (23)
    • ►  May (4)
    • ►  April (2)
    • ►  March (2)
    • ►  February (6)
    • ►  January (9)
  • ►  2014 (95)
    • ►  December (2)
    • ►  November (2)
    • ►  October (6)
    • ►  September (9)
    • ►  August (6)
    • ►  July (16)
    • ►  June (7)
    • ►  May (10)
    • ►  April (9)
    • ►  March (7)
    • ►  February (10)
    • ►  January (11)
  • ▼  2013 (118)
    • ►  December (5)
    • ►  November (6)
    • ►  October (11)
    • ►  September (16)
    • ▼  August (16)
      • Interior walls
      • Interior wall framing and guest house floor
      • Front lanai
      • Lanai posts and joists
      • Framing and Ohia Post Preparation
      • More Framing
      • Framing continues
      • Framing begins
      • Subfloor Installation
      • Floor Joists and Blocking
      • Floor Joists
      • Geckos
      • Removing Form Boards
      • Post-Pour Concrete Work & First Bananas
      • Concrete Pour
      • Orchid Show
    • ►  July (14)
    • ►  June (9)
    • ►  May (13)
    • ►  April (4)
    • ►  March (5)
    • ►  February (4)
    • ►  January (15)
  • ►  2012 (76)
    • ►  December (10)
    • ►  November (15)
    • ►  October (19)
    • ►  September (22)
    • ►  August (10)

Followers

Powered by Blogger.