Thursday, August 29, 2013

Interior wall framing and guest house floor

The first of the interior walls is up.

Looking into the main building from (what will be) the front doorway towards the back. In the foreground will be the living room, to the left is the dining room, and the the right is the bedroom.

This is what we are calling the music room. Beyond is the bedroom and to the right is the living room. You can see the ohia posts (still being worked on) through the doorway to the left.
Bedroom
Back all of the master suite.  To the left will be the bathroom and on the right is the closet.
After living in the guest house with just a subfloor for about eight months, we finally have our floor and are ready to install it.
These are the first two rows of flooring, in front of the front door.
It's a tigerwood engineered floor. Engineered (rather than solid) is recommended for high humidity locations, since the engineered expands and contracts less.
These first two rows took quite a while to install, but after this things should go more quickly.

No comments:

Post a Comment