Interior walls

Work on the interior walls is progressing.
Front of the main building
Bathroom and bedroom
Back corner of the main building
Back of the master suite

Work on the ohia posts is also continuing, and bark removal from another one is done.



Posted by david at 9:45 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2015 (23)
    • ►  May (4)
    • ►  April (2)
    • ►  March (2)
    • ►  February (6)
    • ►  January (9)
  • ►  2014 (95)
    • ►  December (2)
    • ►  November (2)
    • ►  October (6)
    • ►  September (9)
    • ►  August (6)
    • ►  July (16)
    • ►  June (7)
    • ►  May (10)
    • ►  April (9)
    • ►  March (7)
    • ►  February (10)
    • ►  January (11)
  • ▼  2013 (118)
    • ►  December (5)
    • ►  November (6)
    • ►  October (11)
    • ►  September (16)
    • ▼  August (16)
      • Interior walls
      • Interior wall framing and guest house floor
      • Front lanai
      • Lanai posts and joists
      • Framing and Ohia Post Preparation
      • More Framing
      • Framing continues
      • Framing begins
      • Subfloor Installation
      • Floor Joists and Blocking
      • Floor Joists
      • Geckos
      • Removing Form Boards
      • Post-Pour Concrete Work & First Bananas
      • Concrete Pour
      • Orchid Show
    • ►  July (14)
    • ►  June (9)
    • ►  May (13)
    • ►  April (4)
    • ►  March (5)
    • ►  February (4)
    • ►  January (15)
  • ►  2012 (76)
    • ►  December (10)
    • ►  November (15)
    • ►  October (19)
    • ►  September (22)
    • ►  August (10)

Followers

Powered by Blogger.