Friday, May 3, 2013

More foundation preparation

After a brief hiatus, work on the foundation has resumed.
The gravel under the concrete and the blocks has to be compacted before the concrete is poured or the blocks can be placed in the final positions.
Mitch compacting the gravel with a compactor while Steve puts the finishing touches on a form.


 The site after the compacting is done.
A completed form.The stakes are to hold the form in place and prevent it from coming apart from the weight of the concrete when it's poured in.  The strings mark the centers of the forms.
 Master suite
The main house

No comments:

Post a Comment