This landing will be divided into two steps |
Thursday, October 31, 2013
Wednesday, October 30, 2013
Stair stringers
The interior star stringers are cut and ready to put in,
Stringers for the interior stairs (there's no roof, so it still rains inside the house) |
This is where the stringers will go |
Thursday, October 24, 2013
Office windows
The office was wrapped with Tyvek and the windows were installed.
Front and side of the office |
Looking out the front windows |
Back windows |
Looking down from the office at what will become the stairs (top landing is to left) |
This will become a short wall (known as a pony wall) at the back of the office next to the stairs |
Since the trusses are done, the fascia can be installed (front of the master suite) |
The ridge (center beam) was put in on the breezeway |
Master suite side and front |
Office trusses |
View of the master suite |
Friday, October 18, 2013
Wednesday, October 16, 2013
Trusses done
All of the trusses are in and work on the purlins has started.
Trusses on the main building, with some purlins visible |
Trusses and purlins on the master suite |
This will become the landing of the stairs to the second-floor office |
Under what will become the stairs (this will be a closet) |
Monday, October 14, 2013
Second floor trusses done
The second floor (office) trusses are done.
Work is also progress in the interior. This will become a landing for the stairs going up to the second floor.
Work is also progress in the interior. This will become a landing for the stairs going up to the second floor.
View of the stairs to be from the other side |
First Windows
The first of the windows are in.
Work is also progressing on the second floor (office) trusses.
I've also been working on painting boards that will be used as purlins (board that go perpendicular to the trusses to hold the roofing panels).
Breakfast nook (with pantry to the left) |
Kitchen |
Dining room |
View of the kitchen from the living room |
Laundry room from the outside |
Mitch attaching the corner trusses |
Friday, October 11, 2013
Exterior Walls Done & Ready for Windows
The windows and siding were delivered this morning.
The Tyvek is (mostly) installed.
While all this has been going on, we've also been finishing the cumaru that will be used for the lanai and breezeway flooring.
The Tyvek is (mostly) installed.
Front of the main building |
Side of main house (with master suite to the left and breezeway beams overhead) |
Front door from the inside |
Mitch finishing floorboards |
Friday, October 4, 2013
Wednesday, October 2, 2013
First Office Truss
The first of the office trusses (and more of the first floor trusses) are in.
This is the center truss. The roof will be a hip (sloped on all four sides), so there will be trusses on all four sides. |
Corner truss |
Tuesday, October 1, 2013
Roof trusses
Most of the roof trusses for the first floor are up.
Trusses on the side of the house -- to the right is the half-built breezeway to the guesthouse. |
Back of the house and master suite in the background |
View looking through the main building to the guesthouse |
We bought a lime tree a while ago and it's fruiting |
It's a variety called calamondin lime, which we didn't know is different from a standard lime. It's a hybrid between a Mandarin orange and a kumquat. The fruit taste like a sour orange. |