Friday, October 11, 2013

Exterior Walls Done & Ready for Windows

The windows and siding were delivered this morning.

 The Tyvek is (mostly) installed.

Front of the main building
Side of main house (with master suite to the left and breezeway beams overhead)
Front door from the inside
While all this has been going on, we've also been finishing the cumaru that will be used for the lanai and breezeway flooring.
Mitch finishing floorboards

No comments:

Post a Comment