Monday, November 18, 2013

Main Building Siding

The first siding on the main building is up.


The siding on the front of the master suite and the front door were also installed.


Site of future master suite side wall and side door

Friday, November 15, 2013

First Siding Up

The first of the siding panels are up. We've been painting the grooves first, because it is much easier to paint before they are put up (it has to be done by brush, since a roller can't gt into the grooves), and the tops and bottoms (for the sake of neatness).


Far side of the master suite
Back of the master suite
Other side of the master suite
 The forms were taken off the concrete slabs.
Shed
Landing for kitchen door
Landing for back lanai (the shed pad is in the background)




Wednesday, November 13, 2013

Concrete landings poured

We poured the concrete for the exterior stair landings today.
Form for the main house front landing

Kitchen door landing form
In front of the main building
In front of the master suite
Next to the kitchen
Landing for the staircase from (what will become) the back lanai
Shed for the water heater, water pump filtration system, etc.  The thicker part will be the enclosed shed, and the thinner part will be a "covered porch" space.
Smoothing extra concrete to make pavers. The concrete has to be purchased in increments of cubic yards, and rather than just dumping the excess, we poured it between a couple of boards and smoothed it. After letting it set for a while, it can be broken up to make pavers.


Tuesday, November 12, 2013

More windows

More of the windows are in.
Next to the front door and laundry room
Front door
Master suite closet (left) and bathroom (right)
The roofing work is also progressing.

Monday, November 11, 2013

First banana harvest

The bananas have been growing for a while (http://big-island-living.blogspot.com/2013/08/post-pour-concrete-work-first-bananas.html), and the finally stated to ripen, so we cut them off the trees. We got two pretty big bunches.  These are apple bananas, which are a bit smaller than supermarket (Cavendish) bananas, but they're sweeter and have a nice texture.



Wednesday, November 6, 2013

Breezeway framing done & roof started

The framing of the breezeway connecting the main building to the master suite is done. For the breezeway, trusses were not used, and each rafter is put in individually.

The roofing on the master suite has also been started.
Mitch and Lucky working on the roof
The purlins on the office are done, and it's ready for roofing too.

Temporary treads were put on the stairs, making it a lot easier to get up and down.


Landing at the top