The granite work in the kitchen is nearly done.
 |
Kitchen cabinets and sink with full back splash |
 |
Island and bar |
 |
Island and bar from the side, looking towards the breakfast nook (on the right) and out the front door (on the left) |
Tiling has started in the master bathroom. We're using a natural onyx subway tile, installed vertically in the shower (it's a little hard to see in the photo, but the red square in the middle of the wall is a recessed shelf covered with Redguard).
No comments:
Post a Comment