Wednesday, October 22, 2014

Plumbing Fixtures in Master Bath

Now that the water pump was moved and everything is hooked up, we can finally get the last of the plumbing fixtures installed. We had a delay when the plumbers changed their minds about how to install the tub filler and drain for the bathtub in the master bath. Initially they said to have the tile installer install the entire floor, and they would drill through the tile for the tub filler plumbing. But after the floor was done, they decided they couldn't drill through the tile, so we had to get the tile installer back to remove up the tiles where the tub filler and drain for the tub will be installed.
Tiles removed and holes drilled through the floor 


The tub filler and tub installed. The tile installer will have to come
back again to re-install tiles around the filler and the tub drain.


The wall-mounted toilet with in-wall water tank
Wall-mounted faucet

Running water!