We started installing the ceiling over the covered lanais. The ceilings over both front lanais (in front of the main house and the master suite) and both breezeways need to be sealed (since they would otherwise be open to the attic spaces).
These are the same 16-foot long, 5-inch wide tongue-and-groove boards we used for the office ceiling. I've spent the last several weeks staining and finishing them -- there are about 270 boards total.
|
Lanai in front of the main house |
|
View from the other side |
Some work has also been done on installing the railings on the lanais.
|
Master bedroom side lanai looking towards the back of the house |
|
Looking towards the front |
|
In front of the master bedroom |