Sunday, December 28, 2014

Getting Master Bedroom Ready for Flooring

The painting is done and everything is installed in the bathroom, so we're just about ready to start putting down the floor. We've been getting the floor ready -- cleaning, hammering down any nails that are sticking up, removing drywall mud, etc.

Looking towards the front door (those are lanai ceiling boards on the left side and stair steps on the right side)

The main area of the bedroom
Looking towards the side lanai with the front door on the left and the bathroom on the right



Wednesday, December 17, 2014

Lanai and Breezeway Ceilings Finished

We finished installing the tongue-and-groove board in the front lanai and breezeway ceilings, and I added another coat of polyurethane to seal for moisture. Then the light fixtures were installed.
Front lanai, looking towards the guesthouse
Breezeway, looking towards the guest house