The painting is done and everything is installed in the bathroom, so we're just about ready to start putting down the floor. We've been getting the floor ready -- cleaning, hammering down any nails that are sticking up, removing drywall mud, etc.
 |
Looking towards the front door (those are lanai ceiling boards on the left side and stair steps on the right side) |
 |
The main area of the bedroom |
 |
Looking towards the side lanai with the front door on the left and the bathroom on the right |
No comments:
Post a Comment