Wednesday, August 14, 2013

Floor Joists

Installation of the floor joists is proceeding, and after just one day, most of the main house is done.

View from the front of the main house towards the back.

One side of a shear wall, designed to provide shear (side to side) strength and to secure the frame of the house to the concrete blocks.
The view underneath the house

No comments:

Post a Comment