The second beam of the breezeway is up and the rafters can be installed. |
View from above |
After two adjoining section of the roof are done, the edges are taped with roofing tape ((the silver line along the far edge) and the seam is covered with a ridge cap |
Tape on top of the master suite |
No comments:
Post a Comment