Wednesday, January 29, 2014

Breezeway Nearly Done

The breezeway is almost done.  The framing and all of the roof -- except for where the two section meet are done. And the roof of the main building is done. Some of the siding on the second has also been installed.


View from below
And the view from above

While all this work has been going on, my job has been to paint the joists for the lanais. Painting the wood will help preserve it against the damp environment here.
Front lanai joists (with ohia post wrapped in plastic to the right)
Master bedroom side lanai
I've also been working on the joists for the back lanai. After a coat of white primer, they're painted dark brown to make them less visible between the floorboards.