Breezeway looking into the main house from the guest house |
Breezeway to the master suite. |
Electrical in the bedroom (and bathroom on the other side of the wall) |
Wires that will be connected to the breaker panel |
Cumaru floorboards after two coats of finish. We're finishing them in the master bedroom because there isn't enough space under cover outside. |
No comments:
Post a Comment