Tuesday, February 18, 2014

Plumbing Rough-In is Finished


After a couple more visits, the plumbers have finished the rough in.
Shower and faucet in the main building bathroom
Faucet valve in the master bathroom. The faucet is wall mounted and the valve goes inside the wall.
Master shower valve with diverter for handheld shower head

This is the wall mounted toilet--everything except the bowl goes in the wall and nothing touches the floor.
Pipes for the solar hot water system in the attic space


This is the plumbing trench--two lines are hot and cold supply, and the other two are for the solar hot water system (which will be located on the roof at the front of the house; the wire is for a temperature sensor).

Hot and cold water lines to the master suite

No comments:

Post a Comment