Friday, November 9, 2012

(Re-) Moving Day

We were unable to extend our rental any longer, so we had to pack up all out stuff yet again and move into our semi-finished house.  The electricity has been hooked up for a while, but none of the finish work has been done, so there are no outlets, lights, etc. inside the house--everything has to be run from extension cords that are plugged into temporary outlets at the outside circuit breaker box.
Some of our stuff piled up in the bedroom (with extension cord from outside coming through the window)
Fortunately, we have a working toilet (at long as we keep the water pump plugged in), and the kitchen sink works, so we have a source of water.  The shower fixtures also installed, so the showers work (although they are not tiled yet and we have to keep plastic on the walls). Unfortunately, the hot water heater runs on 240V and can't just be plugged in, so we have no hot water.

Work on the kitchen counters continued, and the second piece was installed and the holes were cut for the sink and the cooktop, and then the sink and faucet were installed.


The hall bathroom vanity was installed and prepared for counter installation.


No comments:

Post a Comment