Door and sidelight (with masking tape still on) |
We also got the toilet in the hall bathroom installed--we can even flush it, but we have to keep the pump that maintains the water pressure plugged in (by extension cord).
After waiting more than eight weeks for tile that we ordered (it was supposed to take "three to four weeks" for delivery), we finally got the tile for the front and back of the shower in the hall bath and the wall of the master bath.
Tile waiting to be installed |
No comments:
Post a Comment