Monday, November 5, 2012

Side Door Installed

The side (kitchen) door of the house was installed, and the house is now more or less secure.  We bought the doors (including the front doors), which are made of solid mahogany, as unfinished and unhung doors, and Mitch (our builder) spent many, many hours sanding, staining, finishing, boring, and hanging them.
Door and sidelight (with masking tape still on)
 Detail of the wood grain

We also got the toilet in the hall bathroom installed--we can even flush it, but we have to keep the pump that maintains the water pressure plugged in (by extension cord).

After waiting more than eight weeks for tile that we ordered (it was supposed to take "three to four weeks" for delivery), we finally got the tile for the front and back of the shower in the hall bath and the wall of the master bath.
Tile waiting to be installed

No comments:

Post a Comment