Wednesday, September 4, 2013

Exterior posts

Most of the exterior posts along the front edge of the front lanais are up.

Front of master suite
The whole thing
The posts are notched to ensure a tight fit and all contact areas are covered with construction adhesive to keep out moisture
 The first of the ohia posts are also ready to be put up.
The tops of the posts are notched so the beams can sit on top
Mitch and Steve putting up the first post
Hazen lends a hand



No comments:

Post a Comment