Wednesday, September 11, 2013

Second floor blocking and views

All of the joists are in and the blocking is done, so the second floor is ready for the subfloor.

Blocking between joists
View of the master suite from the second floor

Looking straight down towards the front of the house
View of the pasture
View of the lot on the other side. We're not exactly sure what's being done there, but it looks like there a greenhouse and a tent, but no buildings
Unfortunately, the trees are two high to get a view of the mountain, even from the second floor.  Here, just a bit of Mauna Kea can be seen through the trees.


No comments:

Post a Comment