Work on the roof has continued and is complete (with just few minor details remaining).
|
The breezeway (looking towards the guest house) roof is done. |
|
The view of the roof at the front of the house from the office (a small section of the ridge cap still needs to be added) |
|
The view of from the side of the office looking towards the back of the house. The shed roof has been taped but still needs a ridge cap. |
|
|
The electricians also finished their work -- all of the switches, outlets, etc. are wired and all the cables are secured to the studs.
|
These are the wires going into the circuit breaker panel. The thick gray cable in the center is the power feed from the main box (100 amps), and the thinner gray cable goes to the master suite. The orange cables are 220 volt (one for the oven and one for the dyer), and the white and yellow cables are for lights and outlet. |
|
Living room switch box |