The last of the wire installation was completed with the wires in the utility shed.
I've been busy painting -- these boards will be used on the perimeters of the lanais and breezeways.
Work has also been progressing on the last of the roof installation -- the ridge caps.
These are some of the finished cumaru boards that will be used for the floors of the lanais and breezeways.
No comments:
Post a Comment