Thursday, May 29, 2014

Wall & Ceiling Primer Done

The primer on the walls and ceilings and the ceiling paint are done.

Laundry room looking out to the breezeway and guest house
Living room and front door
Kitchen and dining room
The kitchen and breakfast nook from the dining room
Office
This is the first bath of the pine ceiling boards moved onto the lanai so I can get started on the next batch
 

Tuesday, May 27, 2014

Dywall Mudding Nearly Done & Exterior Painting

The drywall mudding is nearly done and all the windows, exposed beams, and doorways are masked so the primer can be sprayed on the walls.

Kitchen and dining room
Sitting room (from the dining room)
Back of the office (stairs side)
Front of the master bedroom
Master bath. The areas of the walls that are still exposed will be covered with cement board (for waterproofing), and installing that is the tiler's job,not the drywall installer's.
While this work has been going on inside the house, I've been working on the exterior--painting the siding.
Front of the master suite
Main house
Shed, with the master suite on the left and the main house on the right
Back of the main house with door blocked off for painting and the office above
   
Side of the main house
I've also been working on the pine tongue and groove boards for the breezeway and lanai ceilings. Each board has to be lightly sanded and stained and then two or better three coats of finish on the front and a couple of coats (to reduce the possibility of mold) on the back. This is the first of several batches ...



Monday, May 19, 2014

Drywall Mudding

The drywall mudding has started.

Sitting room
Kitchen and breakfast nook
Front of the office
Living room (looking towards the bathroom & bedroom)


Tuesday, May 13, 2014

Drywall Taping

All of the drywall is up and taping has started.

Master bedroom looking towards the bath and closet
Master bath
Living room looking into the kitchen
 

Monday, May 12, 2014

Drywall Installation Nearly Done

Almost all of the drywall is hung.
Front of the office (with neighbors in the distance)
Side of the office
Looking down the stairs from the office
Bathroom
Kitchen
Sitting room

 

Thursday, May 8, 2014

More Drywall

The drywall installation is continuing.
Bedroom
Other side of the bedroom
Laundry room
Living room ceiling
Kitchen ceiling
 

Kitchen and breakfast nook ceiling
 While the drywall work is being done, I've been working outside finishing these pine, tongue-and0-groove boards that will be used for the ceilings over the breezeways and the overhanging portion of the front lanais. I have about 170 total to do...

Tuesday, May 6, 2014

Wood Finishing

I've been working on finishing various wood portions of the house.

The back lanai after cleaning and putting on another coat of finish
I also put polyurethane sealer on the exposed beams
And another coat of finish on the exterior posts

And the interior posts

Monday, May 5, 2014

Exposed Beams Stained

The drywall installer has been finishing another job, so I used the time to stain the exposed beams.
View towards the kitchen
Front and kitchen side
View from the kitchen
Looking towards the back of the house from the kitchen


Friday, May 2, 2014

First Day of Drywall

The drywall installer began working in the master suite and made good progress for one day.

The bedroom, looking into the bathroom and closet
Side of the bedroom
Looking out the front door
Front and side doors
The ceiling
     The floor on the back lanai was also finished today.


Today, we also received delivery of the kitchen and laundry room cabinets, but it's going to be a few weeks before we're ready to install them, so for now, they'll be stored under the canopy.