Thursday, May 1, 2014

Floor on other Breezeway and Back Lanai, Exposed Beam Prep

The floor of the other breezeway (between the guest house and the main house) is done (except for one edge).


Looking toward the main house (that's a stack of door trim on the side)
Looking the other way
The floor of the back lanai is also about half done
Some of the drywall
More drywall
I've been doing more work on the exposed beams. They're sanded, and I filled in some small holes and gouges.  They're ready to be stained.

This is the beam at the front of the living room looking towards the kitchen and the back of the house

View towards the kitchen

Front beam from the other side