Dywall Mudding Nearly Done & Exterior Painting

The drywall mudding is nearly done and all the windows, exposed beams, and doorways are masked so the primer can be sprayed on the walls.

Kitchen and dining room
Sitting room (from the dining room)
Back of the office (stairs side)
Front of the master bedroom
Master bath. The areas of the walls that are still exposed will be covered with cement board (for waterproofing), and installing that is the tiler's job,not the drywall installer's.
While this work has been going on inside the house, I've been working on the exterior--painting the siding.
Front of the master suite
Main house
Shed, with the master suite on the left and the main house on the right
Back of the main house with door blocked off for painting and the office above
   
Side of the main house
I've also been working on the pine tongue and groove boards for the breezeway and lanai ceilings. Each board has to be lightly sanded and stained and then two or better three coats of finish on the front and a couple of coats (to reduce the possibility of mold) on the back. This is the first of several batches ...