The drywall installation is continuing.
 |
Bedroom |
 |
Other side of the bedroom |
 |
Laundry room |
 |
Living room ceiling |
 |
Kitchen ceiling |
 |
Kitchen and breakfast nook ceiling |
While the drywall work is being done, I've been working outside finishing these pine, tongue-and0-groove boards that will be used for the ceilings over the breezeways and the overhanging portion of the front lanais. I have about 170 total to do...
No comments:
Post a Comment