The hall bathroom counter and sink were installed today. The granite is "Blue Pearl" (it has blu-ish highlights that do not show up well in the photos).
We also got an electrician to temporarily hookup the hot water heater, so now we can take hot showers!
Tuesday, November 13, 2012
Sunday, November 11, 2012
Insect Control
This Hawaiian Garden Spider (Argiope apensa) has been living in and near the kitchen window for several months. We finally saw it catch something. The spider is about 2.5 inches long and is non-poisonous and harmless.
The zig-zag portions of the web are known as stabilimenta and are thought to be warnings to birds that may accidentally fly into and destroy the web and/or insect attractants (they reflect ultraviolet light).
The zig-zag portions of the web are known as stabilimenta and are thought to be warnings to birds that may accidentally fly into and destroy the web and/or insect attractants (they reflect ultraviolet light).
Friday, November 9, 2012
(Re-) Moving Day
We were unable to extend our rental any longer, so we had to pack up all out stuff yet again and move into our semi-finished house. The electricity has been hooked up for a while, but none of the finish work has been done, so there are no outlets, lights, etc. inside the house--everything has to be run from extension cords that are plugged into temporary outlets at the outside circuit breaker box.
Fortunately, we have a working toilet (at long as we keep the water pump plugged in), and the kitchen sink works, so we have a source of water. The shower fixtures also installed, so the showers work (although they are not tiled yet and we have to keep plastic on the walls). Unfortunately, the hot water heater runs on 240V and can't just be plugged in, so we have no hot water.
Work on the kitchen counters continued, and the second piece was installed and the holes were cut for the sink and the cooktop, and then the sink and faucet were installed.
The hall bathroom vanity was installed and prepared for counter installation.
![]() |
| Some of our stuff piled up in the bedroom (with extension cord from outside coming through the window) |
Work on the kitchen counters continued, and the second piece was installed and the holes were cut for the sink and the cooktop, and then the sink and faucet were installed.
The hall bathroom vanity was installed and prepared for counter installation.
Thursday, November 8, 2012
Wednesday, November 7, 2012
First Day of Work
After spending several weeks getting multiple vaccinations, two TB tests, and undergoing an evaluation by a physical therapist (to confirm the ability to lift approximately 50 pounds), Diana began her new job as a IT technician at the Kaiser Permanente Hilo Clinic.
The new office is in an unfinished wing of the building. She is the only person working in this wing. The rest is being used for storage. A bit rustic, but it's very private.
The new office is in an unfinished wing of the building. She is the only person working in this wing. The rest is being used for storage. A bit rustic, but it's very private.
Tuesday, November 6, 2012
Monday, November 5, 2012
Side Door Installed
The side (kitchen) door of the house was installed, and the house is now more or less secure. We bought the doors (including the front doors), which are made of solid mahogany, as unfinished and unhung doors, and Mitch (our builder) spent many, many hours sanding, staining, finishing, boring, and hanging them.
Detail of the wood grain
We also got the toilet in the hall bathroom installed--we can even flush it, but we have to keep the pump that maintains the water pressure plugged in (by extension cord).
After waiting more than eight weeks for tile that we ordered (it was supposed to take "three to four weeks" for delivery), we finally got the tile for the front and back of the shower in the hall bath and the wall of the master bath.
![]() | |
| Door and sidelight (with masking tape still on) |
We also got the toilet in the hall bathroom installed--we can even flush it, but we have to keep the pump that maintains the water pressure plugged in (by extension cord).
After waiting more than eight weeks for tile that we ordered (it was supposed to take "three to four weeks" for delivery), we finally got the tile for the front and back of the shower in the hall bath and the wall of the master bath.
![]() |
| Tile waiting to be installed |
Friday, November 2, 2012
Black & White Night in Hilo
The bathroom tile was grouted, and now the floor is done.
I spend the afternoon putting together the kitchen cabinets.
Each year, Hilo hosts its annual Black and White Night. Many stores and other businesses host music of some sort, and many businesses stay open late and provide (very limited) snacks. People are encouraged to wear black and white.
![]() |
| Tile detail |
![]() |
| Floor cabinets |
![]() |
| Wall cabinets |
![]() |
| An a capella group in the lobby of the Palace Theater |
![]() |
| Guitarist in an art gallery |
![]() |
| Ukelele player in another gallery |
![]() |
| Young jugglers |
![]() |
| In front of the supermarket |
![]() |
| Another group in the Palace Theater |
![]() |
| Exterior of the Palace |
![]() |
| While wandering around, we came across these giant Great Pyrenees |
![]() |
| That night's moon |
Thursday, November 1, 2012
Bathroom Floor Tile & a New Neighbor
Over the past two days, the floor was installed in the hall bathroom. This is a necessary step for installing the toilet (among other things). Since a lot of other designs will be going in this bathroom, we decided on a fairly simple tile for the floor.
Since the front doors won't be ready to install for a while, Mitch put up some plywood as a temporary barrier.
We also received delivery of the kitchen cabinets--un-assembled in boxes.
Sometime in the last day or two, a new chicken wandered in and joined our flock. We later determined that it is likely the variety known as a "Buff Orpington" (buff being the color). This chicken is enormous--at least twice as big as the other chickens.
Since the front doors won't be ready to install for a while, Mitch put up some plywood as a temporary barrier.
![]() |
| Inside |
![]() |
| Outside |
![]() |
| Cabinets |
![]() |
| More cabinets |